--- - Solicitation Detail

All responses to solicitations must be received on or before the due date and time specified below. All times listed are Central Time. All responses to solicitations must be in written form and according to the information requested in each solicitation.

Pre-Bid/Proposal Conferences may be conducted to provide specific project information, explain aspects of the project and address potential bidder/proposer questions. When a Pre-Bid/Proposal is scheduled, the date, time and location will be found on this page and in the solicitation document.

Solicitation Number:
---
Solicitation Title:
---
Type of Solicitation:
---
Date Issued:
---
Pre-Bid/Proposal Conference Date:
---
Conference Location:
---
Due Date:
---
Description:
---
Instructions:
---
Notes:
---
Contract Administrator:
---
Email:
---
Solicitation Latest Update:
---
NIGP Code(s):
---
Small Business Goal:
---
Document NameDocument DescriptionDate
IFB Bike path and Sidewalk Improvements to Red Line/Cavalcade St Btwn Airline and IrvingtonIFB Bike path and Sidewalk Improvements to Red Line/Cavalcade St Btwn Airline and Irvington04-05-2019
Drawings Bike path and Sidewalk Improvements Red Line/Cavalcade Btwn Airline and IrvingtonDrawings Bike path and Sidewalk Improvements Red Line/Cavalcade Btwn Airline and Irvington04-05-2019
Bid Tab Bike path and Sidewalk Improvements Red Line/Cavalcade Btwn Irvington and Airline - ExcelBid Tab Bike path and Sidewalk Improvements Red Line/Cavalcade Btwn Irvington and Airline - Excel04-05-2019
Technical Specifications for Cavalcade Bikepath/Sidewalk Improvements ProjectTechnical Specifications for Cavalcade Bikepath/Sidewalk Improvements Project04-18-2019
Cavalcade Pre-Bid Mtg 4-17-19 Pre-Bid SIgn-In Sheets and Biz Cards Cavalcade Pre-Bid Mtg 4-17-19 Pre-Bid SIgn-In Sheets and Biz Cards04-18-2019
Tech Specs Pages 1-106Cavalcade Specs Part 1 of 404-18-2019
Tech Specs Pages 107-213Cavalcade Specs Part 2 of 404-18-2019
Tech Specs Pages 214-320Cavalcade Specs Part 3 of 404-18-2019
Tech Specs Pages 321-428Cavalcade Specs Part 4 of 404-18-2019
Amendment 1 Responses to Questions to date 4-29-19 + 2 new drawingsAmendment 1 Responses to Questions to date 4-29-19 + 2 new drawings04-29-2019
Corrected A15: ONLY Portland Cement is to be mixed into the subgrade, NOT 5% Lime, as stated previously. Use Cement Stabilized Subgrade ONLY. Please refer to Specification 02338 Portland Cement Stabilized Subgrade for all details.Corrected A15: ONLY Portland Cement is to be mixed into the subgrade, NOT 5% Lime, as stated previously. Use Cement Stabilized Subgrade ONLY. Please refer to Specification 02338 Portland Cement Stabilized Subgrade for all details.05-03-2019
Amendment 3: Q&A & Bid Due Date Ext to Weds 5-15-19Amendment 3: Q&A & Bid Due Date Ext to Weds 5-15-1905-07-2019
Amendment 2: Specs for use of Portland Cement Only for SubgradeAmendment 2: Specs for use of Portland Cement Only for Subgrade05-09-2019
Amendment 4 Q&A Rev Bid Tab Rev Drawing Set 5-14-19 Bid Tab attached separatelyAmendment 4 Q&A Rev Bid Tab Rev Drawing Set 5-14-19 Bid Tab attached separately05-14-2019
Amendment 4 Rev Bid Tab 4019000102 5-14-19Amendment 4 Rev Bid Tab 4019000102 5-14-1905-14-2019
Amendment 5 Extend Bid Due Date to Weds, 5-22-19 2:00 p.m. (1 copy of Bid required)Amendment 5 Extend Bid Due Date to Weds, 5-22-19 2:00 p.m. (1 copy of Bid required)05-14-2019
Amendment 6 Q&A + 2 new drawingsAmendment 6 Q&A + 2 new drawings05-17-2019
Return to Solicitations